Procedure for a new gas supply, without gas connection/network
01
If the supply point does not have a gas connection, you will need to provide the location where the connection will be located. Nedgia will prepare a quote for the extension of the gas network.
02
The customer shall accept the network extension quote.
03
The installer shall report the certificates for indoor installation and common installation.
04
Nedgia will proceed to apply for the licences and execute the necessary work.
05
Nedgia will carry out the gas commissioning.