Main actions involved in connections
Connection of new stem and/or replacement of service valve
Renewal of the connection due to replacement, repair or total or partial displacement of the CRI and which includes the placement of a new stem that must be connected to the network. This new stem must be less than 50 cm away cm from the existing one, otherwise it will be considered a new connection construction plus the cancelling of the existing one.
The stem is the transition or connection element that eases transit from the buried section to the aerial section of the receiving installation, or vice versa.
Construction of new service connection
Connection action for the construction of a new connection due to the installation of a new IRC stem more than 50 cm from the existing one, this action will have to be combined with the action to cancel the existing connection.
The service connection is the part of the gas pipeline located between the distribution network and the supply valve (including the latter). The connection is not part of the consumer installation.